If so, the checkbox in the column “ChaRM” is preselected. Step 1: Scope of Content Activation From ChaRM point of view, all projects are checked looking for an active task list and an active open change cycle.Read chapters 1 to 3 of the Content Activation Guide. Transaction PREPARE_ACTIVATION is used to define the scope of solutions and projects, which will be migrated to Solman 7.2, this transaction will open the first Content Activation Guided Procedure. Pay attention to implement these two SAP Notes too before running the transaction PREPARE_ACTIVATION:Ģ610265 - Content Activation: Add GP1 technical ChaRM checksĢ658285 - Content Activation GP1: Check for inconsistent iBaseĬall transaction /nPREPARE_ACTIVATION in your 7.1 system. Look for SAP Note with name "Composite SAP Note: Preparation for content activation for SAP Solution Manager 7.2" to find the SAP Note for your SAP Solution Manager 7.2 patch version likeĢ645166 - Composite SAP Note: Preparation for content activation for SAP Solution Manager 7.2 as of SP07 So it is recommended to do GP1- Preparation in 7.1 System before the technical upgrade and then after the technical upgrade with the system already in version 7.2 start the content activation from Solman_Setup. NOTE: The GP1 can be also performed in 7.2 System, but no changes can be done to projects / solutions because they are read-only and SMSY is not available!
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |